Project

Cast-in-Place Concrete National BIM Standard Phase Two: Model View Definition

Research purpose

Phase Two – DESIGN: Phase Two of the National BIM Standard process involves translation of the exchange requirements into IFC-based code, and instructions for translator implementation by software companies. Phase One identified three critical exchanges and two priority exchanges as the focus for Phase Two. Model View Definitions (MVDs) that realize the requirements of these exchanges will be generated. The steps in this phase include innovations developed by the Technical Support Team (For members, see Appendix) and will utilize Semantic Exchange Modules (SEMs).

Grantee
Georgia Tech
Project Area
Building Information Models
CPF research grant #
02-13
Award amount
$98,867
Grant period
Jul 2013 - Jul 2014
Grant Status
Complete
Principal Investigator
Professor Chuck Eastman
Industry champions

Peter Carrato – Bechtel, Bill Klorman – Klorman Constrution, Allen Bommer – Bentley Systems

CPF allies
Research deliverables
  1. 1st Interim Report
  2. 2nd Interim Report
  3. 3rd Interim Report
  4. Final Report – A video demonstrating to full SEM capability on one or more BIM tools. Examples included of the capability of making different MVDs from a library of SEMs.