Research purpose

The goal of this research is to empirically compare the cost, schedule and quality performance of design-bid-build, construction manager at risk and design-build delivery methods. Using the same methodology as employed by Konchar and Sanvido (1998), but with a data set of contemporary projects, the comparison will leverage a mixed-method approach, split into two main phases: (I) prediction of performance through multiple linear regression modeling and (II) assessment of model robustness and validity through case studies.

Grantee
University of Colorado
Project Area
Project Delivery
CPF research grant #
02-18
Award amount
$68,525
Grant period
Feb 2018 - Sep 2018
Grant Status
In Progress
Principal Investigator
Keith Molenaar, Ph.D.; Univesrity of Colorado
Industry champions

Greg Gidez, Hensel Phelps

CPF allies

DBIA, CII

Research deliverables

Interim Report
Final Research Report